KEG with support of staffs with long history of academic, professional and administrative experiences and its experienced management team, could make all of the following areas such as computing, designing, preparing technical reports and relevant documents fully maps possible. Executive activities according to the latest standards and methods can do:
1) Water hammer calculation and manufacture and installation of equipment (Water Hammer Analysis)
2) Design, manufacture and installation of Water and Wastewater treatment
3) Design, manufacture and installation of Water and Wastewater Pumping Stations
4) Design, manufacture and installation of water distribution and wastewater collection
5) Design, manufacture and installation of pressurized irrigation systems
6) Design, manufacture and installation of water and sewage pipelines
Web Links
- Kavir Engineering Group Store (1071 Hits)
-
Pumping Station Problems
The history of water use and water engineering in ancient times and created the first human group life back.Due to… Read More -
Water Hammer
Water hammer caused by a change (or sudden) in the velocity of fluid flow in a conduit (network) is created.… Read More -
Engineering Design
The complex engineering company with experienced, brilliant academic and administrative records at the national level and certification requirements, has ISO… Read More -
Water Prodaucts
Kavir Engineering Group Co. following products in accordance with relevant standards at its plant produces : 1- Surge Tank, Air Chamber… Read More
- 1
- 2